Every defect a homebuyer finds at handover was, at some point, a small mistake on site. It might be a loose shutter board, a conduit that missed its junction box, or a batch of concrete that was too wet.
Caught on the day, each one is a quick correction. Caught at handover, it is a snag list, a delay and rework.
Total Quality Management (TQM) is the discipline of catching those mistakes while the building is going up. The idea fits in five words: do it right the first time.
This post explains what TQM looks like on a real Indian construction site, step by step, and what it does and does not include.
Why builders bring in TQM
- Less rework. A defect is easier and cheaper to fix before finishing work covers it.
- Fewer snags at handover. Problems caught early don’t reach the buyer’s snag list.
- Work checked against the drawings and codes as it happens, not after.
- A written record. Every issue is logged, tracked and closed, so management can see the state of quality at any time.
How TQM works: the four stages
1. Quality planning, before work starts
Quality starts before the first pour.
- A site-specific quality plan is written with the developer and shared with every contractor and stakeholder.
- The quality standards that apply to the project are identified, so they meet both the developer’s and the project’s requirements.
- Workmanship standards are set for each type of work, with clear criteria to judge ongoing work against.
- Quality-control tools are agreed, such as pour cards and checklists.
- A formal quality audit plan is set up for the site, with a timetable for periodic review of the site lab, if there is one.
- Regular quality meetings keep everyone held to the standards agreed at the start.
- The project is reviewed up front: drawings, material specifications, workmanship methods, applicable codes, and technical, financial and contractual risks.
2. Checking work against method statements
Contractors submit a method statement: how they plan to do each piece of work. TQM checks that the work on site actually follows it.
- Method statements are reviewed, with clearances from the relevant consultants where needed.
- On-site activities are cross-checked against the approved method.
- This stops shortcuts and keeps quality consistent across different site teams.
3. Testing and inspection
Visual inspections are backed by tests. On concrete, the common site tests are:
- Slump test: checks the workability of each batch of ready-mix concrete before it is poured.
- Cube tests at 7 and 28 days: check that the concrete reaches its strength.
- Rebound hammer and UPV (ultrasonic pulse velocity) tests: check the surface hardness and uniformity of concrete already in place.
- Curing checks: confirm the concrete is kept wet long enough to gain strength.
We review the tests and inspections the contractors carry out, to check they meet the agreed quality standards. We also review manufacturer and third-party test certificates for materials such as cement, sand and steel.
Quality audits are carried out on a sampling basis, not on every square metre of work.
Completed work is audited periodically too. For each problem found, we recommend two things:
- Corrective action: how to remove the defect.
- Preventive action: how to stop it from happening again.
Throughout the project, we also:
- review the documentation of the quality procedures put in place
- check that the quality plan is actually being followed
- check that work matches the drawings and specifications as it is built
4. Tracking every defect to closure: NCRs
When work doesn’t meet the standard, it gets a Non-Conformance Report (NCR).
- Each NCR has a unique ID, photos and a severity rating.
- It moves through Open → Work in progress → Closed, so nothing quietly disappears.
- Together, the NCRs form a complete record from the day a problem was found to the day it was fixed.
For recurring or critical NCRs, a root-cause analysis asks why it happened. Was it a process gap, a material problem, or a design-coordination issue? The findings are discussed with the developer to agree preventive actions, so the fix is aimed at the cause, not just the symptom.
What it looks like on site
A few examples from our site records:
- Sunken slab shuttering not fixed properly. Flagged before the pour and corrected on instruction.
- Electrical conduit not connected to its junction box. Flagged inside the slab reinforcement and corrected before concrete covered it.
- Slump test on every batch of ready-mix concrete. A batch was cleared for pouring only once its workability was satisfactory.
Each of these would have been invisible, and expensive, once the slab was cast.
Some recommendations go beyond catching mistakes and help a structure last longer. For example:
- At slab construction joints, use stoppers and compact the concrete edge at an angle, so the concrete doesn’t flow out during vibration.
- Under expansion joints, fit a half-round pipe as a gutter, so any leaking water is led to the drains.
What the developer gets
- Fortnightly status of all NCRs and the action taken.
- Monthly quality audit reports, built on measured data and photographs.
- Weekly site meetings, or as the developer prefers.
- Recommendations on processes, techniques and tools.
- Access to the Nemmadi app, where checklists, geotagged photos and NCR status are kept and tracked.
TQM covers civil, plumbing, electrical, fire-fighting, landscaping and external development works.
What TQM does not cover
A good engagement is clear about its limits. Our TQM scope does not include:
- Statutory approvals or liaising with authorities
- Design audit, or review of other consultants’ work
- Setting up a site lab or storage
- Site security, safety or housekeeping
- Preparing bills of quantities, tendering, or auditing bills
- Project management or cost management
- Excavation strata classification
- Performance appraisal of contractors
- Interior works
TQM sits alongside your project management team, not in place of it.
Who we work for
We work for both sides of a building. We audit quality for developers during construction, and we inspect homes for buyers and resident associations at handover.
We work for both associations and developers. Where we already hold a quality-assurance engagement with the developer of your building, we will tell you before we quote.
Building a project and want quality checked as it goes up? Talk to us
Quality audits are carried out on a sampling basis and record what is observed and tested on site. This post is general information, not professional advice for a specific project.