Pre-Possession Quality Audit

Home Inspection for RBD Stillwaters

Booking a home at RBD Stillwaters? Before you take possession, get an unbiased 1,200-point inspection from Nemmadi — civil, electrical, plumbing and dampness — so you move in with confidence, not doubt.

enabling quality living — since 2016.

1,200
point inspection checklist
CityBangalore
StagePre-Possession
On site3–4 hrs
Report72 hrs
12,000+Inspections Done
12+Cities Served
10+Years Experience
4.8Google Rating

About the Project

RBD Stillwaters by RBD

RBD Stillwaters is a 199-home residential development by RBD, located on Haralur Road in Harlur, near HSR Layout in East Bangalore. The project rises across two towers of G+14 floors each, offering 2.5, 3 and 4 BHK homes ranging from roughly 1,485 to 2,246 sq ft, with 4 BHK duplex penthouses going up to approximately 2,880 sq ft. Tower A is ready to move in, with Block 2 Wing C possession from June 2025 — making the project largely occupied. Residents have access to a clubhouse, swimming pool, gymnasium, landscaped gardens, jogging track, indoor games including billiards, table tennis and squash, and outdoor sports courts. Even in a project that is largely handed over, a professional inspection before you accept the keys can surface issues that are far easier for the builder to fix now than after you move in.

Developer
RBD
Location
Harlur (Haralur Road), near HSR Layout, East Bangalore
Configurations
2.5, 3 & 4 BHK
RERA
PRM/KA/RERA/1251/446/PR/170824/000104 (Karnataka RERA)

Why Inspect Before Possession

The defects we routinely find in new apartments

In our pre-possession inspections at RBD Stillwaters, the pattern that stands out most is moisture — our engineers found active dampness spots in a meaningful share of homes, and in some cases water had seeped through unsealed toilet floor joints into the space below, a waterproofing issue that needs prompt attention before it worsens behind finished surfaces. Electrical items and incomplete deep-cleaning were also flagged across several homes, alongside unfilled gaps around door frames. Documenting these with photos during your snagging window puts the builder on record to rectify them at no cost to you.

Civil & Structural

Hollow & cracked tiles, uneven plaster, improper slopes, gaps in joinery and wall undulations.

Electrical

Faulty earthing, reverse polarity, loose points, non-functional switches and inadequate load testing.

Plumbing

Leaking joints, low water pressure, blocked drains, improper traps and concealed-pipe seepage.

Dampness & Moisture

Thermal-camera & moisture-meter scans reveal hidden seepage before it becomes structural damage.

The 1,200-Point Inspection

What Nemmadi checks at your RBD Stillwaters home

View full scope
01 · Civil & Finishing
Flooring · Walls & ceilings · Plaster · Paint · Tile bonding · Skirting
02 · Electrical
Earthing · Polarity · Switchboards · Load test · DB & MCB · Points
03 · Plumbing
Water pressure · Drainage · Leak test · Sanitaryware · Traps & vents
04 · Doors & Windows
Alignment · Locks · Seals · Glazing · Operation · Hardware finish
05 · Dampness
Thermal imaging · Moisture mapping · Seepage source · Ceiling stains
06 · Kitchen & Bath
Counter slopes · Waterproofing · Fittings · Ventilation · Cladding

Our Process

From booking to detailed report in 72 hours

01
2 Minutes

Book Online

Tell us your flat size, tower and preferred date at RBD Stillwaters.

02
On Site

Engineers Visit

Civil engineers arrive with thermal cameras, moisture meters and the full checklist.

03
3–4 Hours

Full Inspection

Every room and system checked thoroughly, end to end.

04
72 Hours

Your Report

A detailed PDF with photos, severity ratings and a builder follow-up letter.

Reviews

12,000+ homebuyers inspected with confidence

Rated 4.8 on Google across thousands of reviews

★★★★★

I booked Nemmadi for the PDI of my new Villament based on the recommendations of other co-owners in the same property. They sent a team of 4 for the inspection, were on time, and equipped to do all the required checks — Civil, Plumbing and…

V Vishwanath BR
★★★★★

I had a very good experience with Team Nemmadi House Inspection. The inspection was carried out thoroughly and professionally, with attention to detail across all areas of the property. The report was clear, well-structured, and easy to understand. A special mention to Dileep, who conducted…

N Neha Babu
★★★★★

Very nice experience — the team was professional and kind throughout the process. Mr. Nageshwara Rao was very supportive in providing all the details and prioritising the services as per our needs. The technical team who visited the site were technically sound and were able…

P Pradeepkumar Reddy

FAQ

Inspecting your RBD Stillwaters home — answered

Why should I get a home inspection at RBD Stillwaters?

A new home can look perfect yet hide defects in concealed plumbing, electrical earthing, tile bonding and waterproofing. An independent inspection before possession documents every issue with photos so RBD fixes them at their cost — not yours later.

When should I schedule — before or after possession?

Ideally during your snagging window, before you sign the possession letter — that is when the builder is still obligated to rectify defects. If you have already taken handover, an inspection still helps you raise issues within the defect-liability period.

How long does it take and when do I get the report?

A typical 3 BHK takes 3–4 hours on site. You receive a detailed PDF report with photographs, severity ratings and a builder follow-up letter on the 3rd working day.

What does the 1,200-point checklist cover?

Civil and finishing, electrical, plumbing, doors and windows, kitchen and bathrooms, and a dedicated dampness scan using thermal cameras and moisture meters.

Does Nemmadi also do RWA handover audits at RBD Stillwaters?

Yes. We have helped 55+ apartment societies audit common areas, amenities and infrastructure before accepting handover. If your RBD Stillwaters RWA is approaching handover, request an RWA audit quote.

Get Started

Unit at RBD Stillwaters? Get your Home Inspection before you sign.

Get a detailed report on the 3rd working day. 1,200-point checklist covering civil, electrical, plumbing and dampness.