Pre-Possession Quality Audit

Home Inspection for Disha Pursuit Of Sunshine

Booking a home at Disha Pursuit Of Sunshine? Before you take possession, get an unbiased 1,200-point inspection from Nemmadi — civil, electrical, plumbing and dampness — so you move in with confidence, not doubt.

enabling quality living — since 2016.

1,200
point inspection checklist
CityBangalore
StagePre-Possession
On site3–4 hrs
Report72 hrs
12,000+Inspections Done
12+Cities Served
10+Years Experience
4.8Google Rating

About the Project

Disha Pursuit Of Sunshine by Disha

Disha Pursuit Of Sunshine is a 322-home development by Disha, located on Budigere Road (Budigere Cross) in Bengaluru East. The project rises across two towers — Block A and Block B — of 18 floors each, offering 2 and 3 BHK apartments ranging from 813 to 1,235 sq ft in carpet area. Residents have access to a temperature-controlled swimming pool, a fully equipped gym, a clubhouse, a kids' play area, and an amphitheatre. The project is currently under construction, with the RERA completion date set for December 2026. With possession approaching, a thorough pre-handover inspection is the most effective way to catch and document snags before you accept the keys.

Developer
Disha
Location
Budigere Road (Budigere Cross), Bengaluru East
Configurations
2 & 3 BHK
RERA
PRM/KA/RERA/1251/446/PR/100323/005790 (Karnataka RERA)

Why Inspect Before Possession

The defects we routinely find in new apartments

In our pre-possession inspections at Disha Pursuit Of Sunshine, the bathrooms — both the common toilet and the master-bedroom toilet — consistently needed the closest attention. The finishing-related issues our engineers flag most often here include scratched floor tiles, unfilled gaps where door frames meet the floor, and missing lock-receiver caps on doors. A recurring functional item worth checking at this project is the electrical distribution board: circuit diagrams were frequently absent, which matters for safety and for any future electrical work. All of these are snags the builder is obliged to rectify free of cost if documented during your snagging window.

Civil & Structural

Hollow & cracked tiles, uneven plaster, improper slopes, gaps in joinery and wall undulations.

Electrical

Faulty earthing, reverse polarity, loose points, non-functional switches and inadequate load testing.

Plumbing

Leaking joints, low water pressure, blocked drains, improper traps and concealed-pipe seepage.

Dampness & Moisture

Thermal-camera & moisture-meter scans reveal hidden seepage before it becomes structural damage.

The 1,200-Point Inspection

What Nemmadi checks at your Disha Pursuit Of Sunshine home

View full scope
01 · Civil & Finishing
Flooring · Walls & ceilings · Plaster · Paint · Tile bonding · Skirting
02 · Electrical
Earthing · Polarity · Switchboards · Load test · DB & MCB · Points
03 · Plumbing
Water pressure · Drainage · Leak test · Sanitaryware · Traps & vents
04 · Doors & Windows
Alignment · Locks · Seals · Glazing · Operation · Hardware finish
05 · Dampness
Thermal imaging · Moisture mapping · Seepage source · Ceiling stains
06 · Kitchen & Bath
Counter slopes · Waterproofing · Fittings · Ventilation · Cladding

Our Process

From booking to detailed report in 72 hours

01
2 Minutes

Book Online

Tell us your flat size, tower and preferred date at Disha Pursuit Of Sunshine.

02
On Site

Engineers Visit

Civil engineers arrive with thermal cameras, moisture meters and the full checklist.

03
3–4 Hours

Full Inspection

Every room and system checked thoroughly, end to end.

04
72 Hours

Your Report

A detailed PDF with photos, severity ratings and a builder follow-up letter.

Reviews

12,000+ homebuyers inspected with confidence

Rated 4.8 on Google across thousands of reviews

★★★★★

I booked Nemmadi for the PDI of my new Villament based on the recommendations of other co-owners in the same property. They sent a team of 4 for the inspection, were on time, and equipped to do all the required checks — Civil, Plumbing and…

V Vishwanath BR
★★★★★

I had a very good experience with Team Nemmadi House Inspection. The inspection was carried out thoroughly and professionally, with attention to detail across all areas of the property. The report was clear, well-structured, and easy to understand. A special mention to Dileep, who conducted…

N Neha Babu
★★★★★

Very nice experience — the team was professional and kind throughout the process. Mr. Nageshwara Rao was very supportive in providing all the details and prioritising the services as per our needs. The technical team who visited the site were technically sound and were able…

P Pradeepkumar Reddy

FAQ

Inspecting your Disha Pursuit Of Sunshine home — answered

Why should I get a home inspection at Disha Pursuit Of Sunshine?

A new home can look perfect yet hide defects in concealed plumbing, electrical earthing, tile bonding and waterproofing. An independent inspection before possession documents every issue with photos so Disha fixes them at their cost — not yours later.

When should I schedule — before or after possession?

Ideally during your snagging window, before you sign the possession letter — that is when the builder is still obligated to rectify defects. If you have already taken handover, an inspection still helps you raise issues within the defect-liability period.

How long does it take and when do I get the report?

A typical 3 BHK takes 3–4 hours on site. You receive a detailed PDF report with photographs, severity ratings and a builder follow-up letter on the 3rd working day.

What does the 1,200-point checklist cover?

Civil and finishing, electrical, plumbing, doors and windows, kitchen and bathrooms, and a dedicated dampness scan using thermal cameras and moisture meters.

Does Nemmadi also do RWA handover audits at Disha Pursuit Of Sunshine?

Yes. We have helped 60+ apartment societies audit common areas, amenities and infrastructure before accepting handover. If your Disha Pursuit Of Sunshine RWA is approaching handover, request an RWA audit quote.

Get Started

Unit at Disha Pursuit Of Sunshine? Get your Home Inspection before you sign.

Get a detailed report on the 3rd working day. 1,200-point checklist covering civil, electrical, plumbing and dampness.