KAOMA 2026: What Every RWA in Karnataka Needs to Do Now

21 min read

Download our free 10-slide KAOMA 2026 checklist. It has the 7 steps, deadlines, penalties and a to-do list to share with your RWA committee.

Download the PDF

KAOMA is now law, and your RWA has new duties

Karnataka’s new apartment law is official. The Karnataka Apartment (Ownership and Management) Act, 2026, or KAOMA 2026, received the Governor’s assent on 9 October 2026. It was published in the Karnataka Gazette on 15 October 2026 as Karnataka Act No. 45 of 2026.

You can read the full text of the KAOMA Act here (Karnataka Gazette PDF, in Kannada and English).

KAOMA 2026 replaces the two old 1972 laws on flats and apartment ownership (Section 66). For the first time, every apartment association in Karnataka works under one clear set of rules. Your RWA gets real legal powers, like recovering unpaid dues. It also gets clear legal duties, with penalties for ignoring them.

The clock matters too. Many deadlines in the Act, such as 3 and 6 months for registration and bye-laws, run from the date the government notifies the Act’s commencement (Section 1(2)). The rules, model bye-laws and the Competent Authority are also still to be announced. So the smart move is to get ready now, before the deadlines start.

This guide explains, in plain language, what your RWA needs to do. Each step includes the section of the Act it comes from.

Is the Karnataka Apartment Ownership Act 1972 repealed?

Yes. KAOMA 2026 repeals both the Karnataka Apartment Ownership Act, 1972 and the Karnataka Ownership of Flats Act, 1972 (Section 66(1)). If you were looking for the old Act, KAOMA is now the law that applies to your apartment.

Anything already done under the old Acts is treated as done under KAOMA, and existing rights and liabilities carry on (Section 66(2)). Associations registered under KAOA 1972 automatically count as associations under KAOMA (Section 22(6)).

Does KAOMA 2026 apply to your apartment?

If your project has more than 8 apartments, KAOMA almost certainly applies to you (Section 1(3)). It covers old and new projects alike.

Covered:

  • Projects with more than 8 apartments, in one building or several.
  • Villas that are part of a single plot approval or development plan approval.
  • Projects with more than 8 apartments built on sites in approved layouts.
  • Plotted or villa layouts that share common areas, facilities or services run by an association (Section 1(5) proviso).

Not covered:

  • Government or local authority office buildings (Section 1(4)).
  • A building owned by one person and not meant to be split into flats, even if rented out.
  • Plotted or villa layouts where each plot is sold separately and roads, parks and civic amenities are handed to the local authority (Section 1(5)).

If you are unsure, assume the Act applies and start preparing. The steps below are good practice for any RWA anyway.

What should I check before buying a flat under KAOMA?

KAOMA 2026 protects homebuyers, but only if you check the right things before you sign. Here’s what to look at.

Pending dues: Ask the seller for a dues statement issued by the association (Section 27(1)). Unpaid dues stay with the flat, and you can be held liable for them, though you can recover the amount from the seller (Sections 20(4) and 27(3)).

Parking: Open, stilt, basement and podium slots are common areas and cannot be sold. Only an enclosed, separately approved parking unit conveyed by registered deed can be sold (Section 2(y)).

Undivided share (UDS): Your sale deed should state your share of the land and common areas, matching the builder’s declaration (Section 11(2)).

Declaration: Check that the builder has filed the project declaration with the Competent Authority (Section 13).

Building age: If the building is over 30 years old, ask for its latest structural stability certificate (Section 31).

Documents only tell part of the story. A pre-purchase home inspection shows you the defects that paperwork won’t.

Step 1: Get your association registered or recognised

Under KAOMA, every project must have one registered association, and every flat owner is automatically a member (Sections 21(5) and 21(7)). What you need to do depends on where your RWA stands today.

If your RWA is already registered under the Karnataka Societies Registration Act, the Co-operative Societies Act, the 1972 Apartment Ownership Act or the Companies Act, it is automatically treated as an association under KAOMA (Section 22(6)). Within 6 months of commencement, you must:

  1. File your registration details, member list and bye-laws with the Competent Authority, in the format the rules will set (Section 22(7)(a)).
  2. Update your bye-laws to match KAOMA and the model bye-laws (Section 22(7)(b)). Step 2 covers this.

If your project has more than one association, for example one per tower or phase, they must merge into a single association (Section 22(6) proviso). Sub-committees for towers or phases are still allowed (Section 21(5)).

If flats are sold but there is no association yet, the residents must apply for registration within 3 months of commencement (Section 22(1)). The application goes with your bye-laws. The Competent Authority must decide within 60 days (Section 22(3)).

If your project is new, the builder must help form and register the association within 3 months of most flats being allotted (Section 21(2)). Residents share this responsibility (Section 21(3)). If the builder delays, the Competent Authority can step in and fine them (Sections 21(4) and 52).

Good to know:

  • From now on, new apartment associations cannot be registered under the Societies Act or Co-operative Societies Act. KAOMA is the only route (Section 22(5)).
  • One person gets one vote, however many flats they own (Section 21(7)).
  • The builder is a member for unsold flats and must pay maintenance on them (Sections 21(8) and 25(6)).

Step 2: Bring your bye-laws in line with the Act

Your bye-laws are now the rulebook the law will enforce, so they must match KAOMA. Existing RWAs have 6 months from commencement to update them (Section 22(7)(b)).

What your bye-laws must cover (Section 35):

  • How the Executive Committee and office bearers (President, Secretary, Treasurer) are elected, their powers, and how they can be removed.
  • How AGMs and special meetings are called, the quorum, how minutes are kept, and the vote needed for each type of decision.
  • How funds are run, how maintenance and other charges are collected, and how accounts are kept and audited.
  • Who keeps the project’s documents, how common areas are maintained, and how staff and security are hired and supervised.
  • Rules on using flats and common areas, and how fines for breaking them are decided and collected.
  • Leasing of commercial spaces in the building, and how that income is used.

Model bye-laws are coming. The government will publish draft model bye-laws for 30 days of public comment, then notify the final version (Section 37). You can adopt them with changes, but any change needs the Competent Authority’s approval (Section 32(3)). Watch for the draft and send your comments.

Changing your bye-laws (Section 34):

  1. Pass a resolution in a general body meeting with at least two-thirds of owners present and voting in favour.
  2. Make sure at least one-third of all members attend, or the meeting has no quorum.
  3. Submit the amendment to the Competent Authority. If it doesn’t decide within 30 days, the change is treated as approved.

Fines on residents (Section 36): Your RWA can fine owners or tenants who break the bye-laws, but only if the bye-laws allow it. You must first send a written notice and give them a fair hearing. A fine cannot be more than one month’s maintenance, and it goes into the common fund. Residents can appeal to the Competent Authority.

Bye-laws are binding on owners, their heirs, buyers and tenants alike (Section 36(1)).

Step 3: Set up your Executive Committee under the new rules

KAOMA limits how long one committee can stay in charge, so check your current terms now (Section 23).

  • Elected, not nominated: The Executive Committee runs the association and must be elected from among members, as set out in your bye-laws.
  • Two years maximum: A committee’s term cannot exceed 2 years from its election.
  • Two terms in a row, then a break: Anyone who has served two back-to-back terms must sit out the next term.
  • Hold elections on time: If the committee doesn’t hold elections before its term ends, the Competent Authority can appoint an administrator to run them.

The committee is also answerable for its work. It is responsible for negligence in the duties the Act gives it (Section 24(5)). The Competent Authority can fine the association or the committee for missing key filings, such as the yearly audited accounts (Section 28(7)).

To do now: List when each committee member was elected and how many terms they have served. Plan your next election so nobody crosses the limits.

Step 4: Put your money matters in order

KAOMA gives RWAs strong powers to collect dues, but it also expects bank-grade accounting in return.

Maintenance charges (Section 25)

  • Work out your common expenses and charge every owner a share. As a rule, each flat’s share should match its super built-up area as a part of the whole project’s super built-up area.
  • Extra charges for special services, clubhouse use or commercial facilities are allowed if your bye-laws spell them out (Section 25(5)).
  • Every owner must pay, even if they don’t use the facilities (Section 25(3)). If a flat is rented out, you can collect from the tenant, and the owner stays liable (Section 25(4)).
  • The late-payment penalty cannot exceed one month’s maintenance, and it must go into the common fund (Section 25(2)).

Recovering unpaid dues (Sections 25(7), 26 and 27)

  • Unpaid maintenance, user charges and penalties become a legal charge on the flat.
  • Your RWA can apply to the Competent Authority to record this charge against the flat. Apply within 2 years of the dues falling due.
  • Once recorded, the charge stays with the flat even if it is sold. Buyers should ask for a dues statement from the association before buying.

Accounts and audit (Section 28)

  1. Open a bank account in the association’s name with a scheduled bank. Deposit all maintenance, deposits and other collections into it.
  2. Keep proper books: receipts and payments, income and expenditure, and a balance sheet every financial year.
  3. Pay all taxes and statutory dues on common areas and the association’s activities.
  4. Get the accounts audited every year by a chartered accountant.
  5. Submit the audited accounts to the Competent Authority within 6 months of the financial year’s end. Missing this can lead to a penalty.

Any surplus can only be used for purposes allowed by the Act or your bye-laws (Section 28(8)).

Step 5: Insure the building and common areas

Insurance is now a legal duty for the RWA, not an optional extra (Section 29).

  • Property cover: Insure the building and common areas against fire, flood and any other risks your bye-laws list or a majority of owners approve.
  • Liability cover: Take policies for public liability, occupier’s liability and employer’s liability for the common areas. This protects the RWA if a visitor, resident or staff member is hurt.
  • In the association’s name: Policies must be taken in the association’s name, as trustee for all owners.
  • Shared cost: The premium is a common expense, shared by all owners.

Owners can still insure their own flats separately.

To do now: Check what your current policies cover and whose name they are in. Fill any gaps before renewal.

Step 6: Plan for repairs and structural safety audits

Your RWA is legally responsible for keeping the building safe and in line with its approved plans.

Day-to-day upkeep (Section 24)

  • Maintain and repair all common areas, including the clubhouse and any commercial facilities, and keep records of limited common areas.
  • Keep the building in line with its sanctioned plan and occupancy certificate.
  • Act against any owner who builds without approval. The RWA must not break the sanctioned plan itself either.
  • Any change to the building’s structure, or to the number or size of flats, needs 75% of owners’ consent plus the planning authority’s approval (Section 24(6)).

Major repairs (Section 30)

  • If a major repair costs more than the RWA’s available funds, owners must approve it by majority vote in a general body meeting. At least 50% of owners must attend.
  • The cost is shared by all owners, based on super built-up area.
  • If owners can’t decide within 6 months, the committee can go ahead with the Competent Authority’s approval.

Emergency repairs (Section 30(8))

If something is urgent for safety, the committee can fix it straight away without waiting for a general body meeting. It must record why it was urgent and place the work and cost before the next general body meeting for approval.

Damage caused by one flat (Sections 30(6) and 30(7))

If a leak or damage from one flat affects others or common areas, that owner must fix it within 5 days for minor repairs or 30 days for major ones. If they don’t, the RWA can do the repair and recover the cost from them.

Structural stability audit (Section 31)

  1. When your building turns 30 years old, get its structural stability checked by a certified, registered structural engineer.
  2. If certified safe, repeat the check at least once every 5 years.
  3. If repairs or strengthening are recommended, carry them out using the major repairs process above.
  4. If the building is declared unsafe, the engineer must inform the RWA, the Competent Authority and the local authority. The RWA can appeal to an expert committee within 30 days.

For older buildings, KAOMA sets a clear process for redevelopment. Owners can start it once the building reaches an age the rules will set, or earlier if circumstances require it (Section 48(1)).

The 75% rule: Owners of at least 75% of the flats in the whole project must give written consent at a general body meeting called for redevelopment (Section 48(3)). The count is by flats, not by people.

What owners vote on: The proposal must include the redevelopment plan, the floor area to be used, each owner’s rights in the new building, the financing and the timeline (Section 48(2)). It must also say whether owners pay anything, or whether the developer is paid through extra saleable area (Section 48(4)).

Approval: The resolution then goes to the Second Appellate Authority. Once approved, it binds every owner, including those who voted against it (Section 48(3)).

Owners who don’t agree: An owner who didn’t consent can choose a cash settlement instead of a new flat. It must be at least twice the market value of their flat and land share, minus building depreciation, as fixed by a registered valuer (Section 48(6)).

New committee: Once the scheme is approved, the existing Executive Committee is dissolved, and owners elect a new one to run the redevelopment (Section 48(5)).

Step 7: Take over from the builder the right way (HOTO)

KAOMA puts the builder handover, or HOTO (Handover-Takeover), on a legal footing for the first time. Once your association is registered, the builder must hand over management of the common areas to it (Section 21(10)).

What the builder must hand over (Sections 16(1) and 21(11))

Within 60 days of the Occupancy Certificate, the builder must give the association all original documents and records. The Act lists 15 record categories, set out in full in the next section.

Within the same 60 days, the builder must also transfer all money collected for common areas, including corpus, maintenance deposits, security deposits and advance maintenance, with interest. This must come with an audited statement showing flat-wise details (Section 16(1)(c)).

What your RWA must do

  1. Check every document and fund against the 15 record categories listed below before signing off.
  2. Formally acknowledge receipt of the documents and send a copy of that acknowledgement to the Competent Authority (Section 16(1)(b)(xv)).
  3. Take over the running of all services and common infrastructure (Section 21(11)(d)).
  4. From then on, the RWA is responsible for running, maintaining and repairing the common areas (Section 21(12)).

Your protections after handover

  • The builder stays liable for structural and other defects for the full RERA defect liability period (Section 21(13)).
  • The builder cannot build anything more in the project unless it was in the declared sanctioned plan, or the Competent Authority and two-thirds of owners approve it (Section 16(4)).
  • Until the RWA takes over, the builder must keep maintaining the common areas and providing essential services (Section 16(3)).

If the builder doesn’t hand over

Complain to the Competent Authority. Not handing over documents, funds or management breaks the Act. The builder can be fined up to ₹20,000 per violation, plus up to ₹1,000 a day until it is set right, and ordered to comply (Section 52(2)).

Still to be clarified by the rules

  • The exact deadline for transferring management to the association will be notified by the government (Section 21(10)).
  • It is not yet clear how the 60-day document and fund handover will apply to older projects whose Occupancy Certificate came years ago.

A missing document or an unchecked defect at handover is hard to fix later. That’s why a technical inspection of the common areas before you sign off is so important.

Do you need help checking the 15 mandatory record categories required during HOTO?

Section 16(1)(b) of KAOMA lists 15 categories of records the builder must hand over to the association within 60 days of the Occupancy Certificate:

  1. Land title documents
  2. The declaration filed with the Competent Authority
  3. Lease deed or lease certificate, if the land is leased
  4. Sanctioned plans, approvals and completion certificates
  5. As-built and structural drawings
  6. Fire safety, lift safety and environmental compliance certificates
  7. Insurance policies for the project
  8. Encumbrance certificates and related records
  9. Electrical wiring diagrams, plumbing layouts and service drawings
  10. Equipment purchase, installation and commissioning records
  11. Operation manuals, service manuals and warranties
  12. AMCs and vendor contacts for lifts, generators, fire systems, water treatment plants and other facilities
  13. Access credentials and software documentation for building management and security systems
  14. Receipts for municipal taxes and dues paid up to handover
  15. Any other records the rules prescribe

This is a minimum list, not a limit. Once the RWA receives the records, it must acknowledge receipt and send a copy of that acknowledgement to the Competent Authority (Section 16(1)(b)(xv)).

Missing records are much harder to get once the builder has moved on. Nemmadi’s HOTO team can check each category for your project and inspect the common areas before you sign off.

Get a HOTO audit quote for your association

What happens if your RWA doesn’t comply?

KAOMA has real teeth, and they apply to associations as well as builders.

  • Fines: If the association breaks the Act, rules or bye-laws, the Competent Authority can fine it up to ₹20,000 per violation, plus up to ₹1,000 a day while it continues (Section 52(2)).
  • Forced fixes: The authority can order the RWA to correct the problem. If the RWA doesn’t, the authority can get the work done and recover the cost as arrears of land revenue or property tax (Section 52(3)).
  • Audit penalty: Missing the 6-month deadline for audited accounts can bring a separate penalty on the association or its committee (Section 28(7)).
  • Administrator: If the committee doesn’t hold elections on time, an administrator can be appointed (Section 23(5)).
  • Takeover: If two-thirds of owners ask, the Competent Authority can take over the association’s functions for a period (Section 43).

The Act works for RWAs too. If a builder fails to help form the association, execute sale deeds or submit the declaration, the association’s Secretary can file a complaint. The builder can be fined up to ₹1 lakh, plus ₹1,000 a day (Section 52(1)). If the builder doesn’t hand over documents, funds or management, it can be fined up to ₹20,000 per violation, plus ₹1,000 a day (Section 52(2)). Disputes go to the Competent Authority rather than civil courts (Sections 53 and 60).

Your RWA’s KAOMA checklist

Use this table to track where your RWA stands. Deadlines marked “commencement” start from the date the government notifies.

Task Who it applies to Deadline Section
Confirm KAOMA applies to your project Every RWA Now 1(3) to 1(5)
Open a bank account in the association’s name Every RWA Now 28(1)
Review insurance: property, public, occupier’s and employer’s liability Every RWA Now, or at next renewal 29
Check committee terms and plan the next election Every RWA Before the current term ends (2 years max) 23
Merge multiple associations into one Projects with more than one association When the rules set the process 22(6)
Apply for registration Flats sold, but no association yet 3 months from commencement 22(1)
File registration details, members and bye-laws RWAs already registered under older laws 6 months from commencement 22(7)(a)
Update bye-laws to match KAOMA and model bye-laws RWAs already registered under older laws 6 months from commencement 22(7)(b)
Collect, check and acknowledge handover documents and funds New projects 60 days from Occupancy Certificate 16(1), 21(11)
Get accounts audited by a CA and file them Every RWA 6 months from financial year end 28(5), 28(6)
Structural stability audit Buildings 30 years or older At 30 years, then every 5 years 31

Want to check a section yourself? Download the full KAOMA Act PDF and keep it handy for your next committee meeting.

How Nemmadi can help your RWA get KAOMA-ready

Many KAOMA duties depend on knowing the true condition of your building, and that is what Nemmadi does.

  • Builder handover (HOTO) support: We inspect common areas and services, and check handover documents against the Act’s list, so you sign off with nothing missing (Sections 16 and 21).
  • Building audits: Our engineers assess your building’s condition and help you plan repairs before they become emergencies (Sections 24, 30 and 31).
  • RWA Health Checkup: A complete review of your common areas, safety systems and maintenance practices, giving your committee a clear starting point under the new law.

Want to know how ready your RWA is? Talk to Nemmadi today.

Already took over from the builder? Book an RWA Health Checkup to find out what needs fixing before the KAOMA 2026 deadlines start.

Frequently asked questions

Is KAOMA 2026 in force now?

Yes, it is law. It received the Governor’s assent on 9 October 2026 and was gazetted on 15 October 2026. However, the government still has to notify the commencement date, frame the rules and appoint the Competent Authority. The Act’s 3- and 6-month deadlines start from commencement (Section 1(2)).

Is builder handover mandatory for apartment associations now?

Yes. The builder must hand over all project documents and common-area funds within 60 days of the Occupancy Certificate. It must also transfer management of the common areas once the association is registered (Sections 16(1) and 21(10)). The association must then take over and send an acknowledgement of the documents to the Competent Authority.

Our RWA is registered under the Societies Registration Act. Do we need to register again?

No. Your RWA is automatically treated as an association under KAOMA. You must still file your details and update your bye-laws within 6 months of commencement (Sections 22(6) and 22(7)).

Who is the Competent Authority?

It hasn’t been announced yet. The government must appoint one within 3 months of commencement (Section 38).

Can our RWA charge the same maintenance for every flat?

The Act says maintenance should generally be shared in proportion to each flat’s super built-up area. Your bye-laws set the exact basis. Charges for special services or facility use can be added on top (Section 25(2)).

What is the maximum late fee we can charge?

No more than one month’s maintenance for that flat. The money must go into the common fund (Sections 25(2) and 36(4)).

Can we collect maintenance from a tenant?

Yes. If the owner doesn’t live in the flat, the RWA can collect from the tenant, and the owner remains liable (Section 25(4)).

When is a structural audit mandatory?

Once your building is 30 years old, and then at least every 5 years if it’s certified safe (Section 31).

Can our RWA cut water, electricity or lift access for maintenance defaulters?

No. For an owner who keeps defaulting, the RWA can restrict non-essential facilities listed in its bye-laws, such as the clubhouse, gym or pool, after giving notice. Water, electricity, sanitation, lifts, fire safety systems and access to the flat can never be withheld (Section 20(6)).

How can our RWA recover long-pending maintenance dues?

Unpaid dues, plus interest, become a legal charge on the flat (Section 20). The RWA can ask the Competent Authority to record this charge within 2 years of the dues falling due (Section 26). The authority can also order the owner to pay with interest and costs (Section 20(7)).

Does a resale buyer have to pay the previous owner’s maintenance dues?

They can be. The buyer and seller are jointly liable for any dues unpaid up to the date of sale (Section 20(4)). A seller can ask the RWA for a dues certificate, and the RWA cannot later claim more than the amount stated in it (Section 20(5)). Buyers should always ask for this certificate before buying.

Can the builder sell open, stilt or basement parking slots?

No. Open, stilt, basement and podium parking are common parking and stay part of the common areas. They cannot be sold or transferred as separate property, and marking or allotting a slot does not make it private (Section 2(y)). Only a garage or bay that is a separate built-up unit, approved as such in the sanctioned plan and conveyed by registered deed, counts as private parking. Even that can only be sold to another owner in the same project.

Who owns the clubhouse and other community or commercial spaces?

Unless the declaration clearly says otherwise, they are common areas owned by all apartment owners (Section 12(1)). The RWA can charge reasonable user fees, but outsiders cannot use these facilities on a regular or commercial basis, and any income goes to the common fund (Section 12). No one, including the builder, can keep exclusive control of a common area or turn it into saleable space without the owners’ consent (Sections 11(8) and 11(11)).

Can the RWA enter my flat for repairs?

Yes, when it’s needed to maintain or repair common areas or to prevent damage, such as a leaking shared pipe. Authorised RWA representatives can enter at reasonable hours after giving notice, and without notice in an emergency (Sections 11(10) and 18(p)).

Can I renovate my flat or break a wall?

Interior work is fine, but you cannot touch load-bearing walls, columns or beams (Section 18(g)). Any change that affects the building’s structure, safety or outside look needs the RWA’s approval first, plus the authority’s approval where the law requires it (Section 18(f)). If an owner breaks this rule, the RWA can send a notice, hear them, and then undo the work at their cost (Section 19).

Can I change my balcony grills, windows or exterior colour?

Not without the RWA’s approval. Owners cannot change the façade, colour scheme, external walls, windows or elevation on their own (Section 18(h)). Signboards and ads on the outside or in common areas also need RWA permission (Section 18(i)).

Can tenants vote in the apartment association?

No, membership is for owners only (Section 21(7)). Tenants must still follow the Act and the bye-laws (Section 57), and owners are responsible for their tenants’ conduct (Section 18(n)).

If I own two flats, do I get two votes?

Not for normal association matters. Each person gets one vote, however many flats they own (Section 21(7)). For a redevelopment vote, though, each flat counts separately (Section 48).

What is the builder’s declaration, and what if the builder never filed one?

The declaration is the official record of the project, including the land, the flats, the common areas and each flat’s undivided share (Sections 11(2) and 14). The builder must submit it to the Competent Authority within 60 days of the Occupancy Certificate (Section 13(1)). In older projects where flats are already sold and the builder doesn’t file it, the RWA can file it with the authority’s permission (Section 13(2)).

Where can I complain against my RWA or builder?

To the Competent Authority (Section 53). It can decide disputes about maintenance charges, penalties imposed by the RWA, how the RWA is run and its accounts, and each flat’s undivided share. If you disagree with its order, you can appeal to the First Appellate Authority within 30 days, and then to the Second Appellate Authority (Sections 44 and 45).

Can I go to civil court over an apartment dispute?

Not for matters the Competent Authority or the appellate authorities can decide under KAOMA (Section 60). Those disputes now go through the Act’s own system.

How many owners must agree to redevelop an old apartment building?

Owners of at least 75% of the flats in the whole project must give written consent in a general body meeting called for that purpose (Section 48(3)). The resolution then needs approval from the Second Appellate Authority, after which it binds all owners. The minimum building age for redevelopment will be set by the rules (Section 48(1)).

Sources

This article is for general information only and is not legal advice. For decisions specific to your association, consult a lawyer practising in Karnataka. 